Car Park Reconstruction – Broadfields Way, NW10 1RE

Millstar Construction delivered the full reconstruction of a car park at Broadfields Way for Notting Hill Genesis, including the removal of an existing retaining wall and installation of a new reinforced structure.

Works included bulk excavation, new reinforced foundations, and the construction of a reinforced retaining wall with a facing brick finish to match the surrounding area. Boundary improvements were completed with new masonry elements and secure perimeter fencing.

The car park was finished with block paving, alongside tarmac reinstatement to the adjoining road, providing a durable and high-quality surface throughout.

Key Works

  • Site clearance and groundworks
  • Reinforced foundations and retaining wall construction
  • Facing brickwork to match the existing
  • Boundary walls and perimeter fencing
  • Block paving installation
  • Tarmac reinstatement

Client: Notting Hill Genesis
Value: £95,000